Sun Pharmaceuticals Industries Limited, Cranbury, New Jersey
6,000 square foot of existing storage area of the building was to be converted into pharmaceutical manufacturing suite for processing and manufacturing of high potent drugs. The manufacturing suite included laboratory, multiple processing rooms, packaging rooms and other miscellaneous support rooms. The entire area was designed per Food and Drug Administration’s Current Good Manufacturing Practices.
Main feature of the design was to ensure zero cross contamination, environmentally safe discharge of exhaust air and wastewater, safety and protection of personnel. A full HVAC design with strict design criteria for temperature, humidity, room pressurization, HEPA filtration, dust collection, air change rates and exhaust. Plumbing design included processing piping – steam, process hot water, process chilled water and compressed air - along with domestic water and sanitary system design. Related electrical and structural design was provided. Also responsible for overall design for the project as a prime design engineer. Worked with architect, structural engineer, electrical engineer, and owner’s representative to ensure coordinated and complete design package for the project. |
|
Appco Pharmaceutical, Piscataway, New Jersey
Existing 28,000 SF warehouse to be converted into pharmaceutical packaging facility. New space also included laboratories, pharmaceutical R&D suites, administrative offices and GMP warehouse for storage of pharmaceutical raw material and finished products. Mechanical engineer responsible for HVAC and Plumbing design. Design manager for MEP design.
|
|
InvaGen Cipla Pharmaceuticals, Islip, New York
New 13,000 SF suite for dispensing of pharmaceutical material. Portion of the existing warehouse building to be repurposed for new dispensing suite. Mechanical engineer responsible for HVAC and Plumbing design. Design manager for MEP design.
|
|
US Pharma Labs, North Brunswick, New Jersey
Partial existing facility to be converted into microbiology laboratory. Design requirement included maintain the room environment to very low humidity (25% RH) with high air changes. Mechanical engineer responsible for HVAC design and over design project manager.
|
|